/ News
Mining, ore-conveying and ore-dressing capacity doubled at Komdok Mining Complex
  The Komdok Mining Complex pushed ahead with the readjustment and reinforcement of the whole production processes, raising the mining, ore-conveying and ore-dressing capacity two times as against before.
  Highly efficient compressors, rock-drills, jumbos, mining rock jumbos, pneumatic loaders, electric locomotives and pit tubs were reinforced at the underground cutting faces and compressed air pipes, drain pipes and cables stretching to hundreds of parts replaced. Pumping stations and compressor houses were rebuilt on a modern basis, with the result that efficiency of production got higher at the heading and mining preparation faces and stopes.
  The complex has been put on the track of sustainable growth with confidence through qualitative readjustment and reinforcement in the whole processes of mining, ore conveyance and ore dressing.