Efforts made to hit goal of iron and steel production
Kim Chaek Iron and Steel Complex and the Hwanghae Iron and Steel Complex keep boosting the production through vigorous socialist emulations between workshops and between shifts.
The Chollima Steel Complex is increasing the output of molten iron while operating the equipment including the ultrahigh-power electric arc furnace at full capacity and shortening the melting time as against last year.
The Musan Mining Complex is accelerating the preparations for blasting 2,500,000 cubic metres of earth. The Unryul and Jaeryong mines are carrying out their concentrated ore and iron ore production plans while concentrating efforts on the removal of overburden and securing stopes and technically remodelling different production processes.