/ News
DPRK Premier makes field survey of different fields
  Pak Thae Song, Member of the Presidium of the Political Bureau of the Central Committee of the Workers' Party of Korea and Premier of the Cabinet of the Democratic People's Republic of Korea, made a field survey of different fields.
  At the construction site for the fourth-stage project to build 10,000 flats in the Hwasong area, he learned in detail about the promotion of the overall project and said the construction units should give top priority to ensuring the quality and organize more elaborate operation and command so that all the work can be done thoroughly according to the requirements of designs and construction methods.
  Acquainting himself with the paper production and remodelling of the Sinuiju Chemical Fibre Mill, he stressed the need to steadily improve the quality indices of paper and promote the construction project and equipment assembly of all systems in time according to the modernization goal.
  Looking round the railway section between the Jongmunri Railway Station and Wihwa Islet and the bank of the Amnok River, he underscored the need to build the station yard in a qualitative way as the Wihwado Railway Station will be built into a comprehensive centre for transportation and pay attention to ensuring the intensity of railways.
  At the Taean Heavy Machine Complex, Premier Pak underlined the need to decisively improve the quality of castings and steel castings from the material production process and actively introduce advanced processing methods to produce a lot of ordered equipment needed for different fields of the national economy.
  The consultative meetings held on the spot discussed issues concerned and took necessary measures.