Peat processing base with large capacity built in Ryanggang Province
There are a stope, a crushing place and an outdoor peat drying-place in the base with an area of tens of thousand square metres. There is also a managerial and welfare building for the officials and employees.
The province intensifies the work to further raise the shaped peat production capacity by reinforcing technical forces and increasing heavy machines and takes measures to transport a lot of shaped peat to the regions concerned.