Successes registered in field of metallurgical industry
Kim Chaek Iron and Steel Complex updates its daily production results every day while dovetailing the cooperation and relations between the production processes and fully ensuring normal operation of the production equipment.
The Hwanghae Iron and Steel Complex and the Chollima Steel Complex organize detailed work for carrying out their daily production plans, achieving successes.
The Musan Mining Complex has raised the operating rate of the equipment and introduced efficient working methods suited to the actual conditions, carrying out its production plan at 110 percent every day.
The Hungsan Mine and the Hungnam Electrode Factory regard the quality improvement as the primary task and speed up the technical reconstruction of production processes and equipment, normalizing their production.