Construction of Thaesan Coal Mine promoted
Those involved in the construction of the coal mine have conducted the heading excavation for the development of new pit at 65 percent and at the same time, push ahead with the work to secure new coalfield.
The work for installing equipment such as compressors and water pumps is done in a three-dimensional way, and the construction of coal yard and the preparations for installing belt conveyor are powerfully promoted.