Preliminary heating treatment process installed at Inhung Mine
The installation of the process equipped with the advanced integrated automation system, power management system and waste gas and dust cleaner has made it possible to save a lot of electric power and materials and increase the production.
A speech was made at an inaugural ceremony held with the attendance of the officials concerned, officials of South Hamgyong Province, officials and employees of the Inhung Mine and teachers and researchers of the Chongjin University of Mining and Metallurgical Engineering.
After the ceremony, the participants went round the newly-built process.