/ News
Active measures taken to raise level of equipment control and technical management
  Workers in the field of metallurgical industry in North Hamgyong Province are directing big efforts to raising the level of equipment control and technical management.
  Kim Chaek Iron and Steel Complex is laying firm material and technical foundations for increased iron and steel production.
  Workers at Blast Furnace Workshops Nos. 1 and 2 have set right proportion of charges according to the conditions of raw materials and the oxygen-blowing output and introduced an innovative proposal for shortening the melting time, thus boosting the productivity.
  Those at Steel Workshop No. 2 and the Hot-Rolling Workshop are heating the ladle as required by the technical regulations and raising the actual working ratio of the oxygen furnace and rolling mill. The Oxygen Plant Branch Factory manages and operates equipment including expander and air compressor with responsibility, sending oxygen of high purity without letup.
  Workers at the Musan Mining Complex are concentrating forces and means on the concentrated iron ore production while speeding up the preparations for blowing up one million cubic metres of earth at the final stage.
  Miners of the Open Branch Mine have deployed a lot of mining equipment in the districts rich in deposits and dovetailed the processes perfectly to carry out their assignments.
  Workers at the Chongjin Steel Works and the Puryong Ferroalloy Factory are steadily strengthening the production base while conducting brisk mass technical innovation movement for improving the performance of equipment and raising the level of technical management.